D. Investment Deployment – Use of $4M

34. Present a detailed spending plan for all budget items – monthly breakdown for the first 12 months

For the first phase after investment, DeltaX will focus the production scale-up plan on one standard product line: Delta X Smart. This reduces SKU complexity and allows the company to standardize purchasing, assembly, QA/QC, CE compliance, documentation, and customer support.

The current normal production capacity is approximately 8 Delta X Smart units per month. If the current team is pushed to maximum capacity, the company can produce approximately 15 units per month. At the current assembly method, one Delta X Smart requires approximately 5 working days for one assembly employee.

The target after investment is to build production readiness toward 100 Delta X Smart units per month within approximately 12 months.

DeltaX currently operates from a 650 m² facility with a monthly rental cost of approximately VND 60 million. After investment, the company plans to expand to a facility of at least 2,000 m², with an estimated monthly rental cost of approximately VND 100–120 million.

The updated use of proceeds is as follows:

Budget ItemAmountPurpose
Production Scale-up / CAPEX$1,500,000Facility expansion, assembly line setup, production tools, QA/QC equipment, test systems, warehouse setup, traceability system
Working Capital & Initial Component Inventory$700,000Initial component inventory, long-lead-time parts, spare parts, logistics buffer, and production cashflow
Engineering & R&D – Delta X Smart$750,000Product standardization, firmware/software reliability, Vision AI, documentation, testing procedures, CE-ready design improvements
Sales & Marketing$550,000European go-to-market, distributor development, demo units, trade shows, CRM, customer acquisition
CE Certification & Compliance$200,000CE consultant, EMC testing, electrical safety testing, technical file, risk assessment, documentation, lab testing
Strategic IP & Product Acquisition – Elbot$300,000Consolidation of ownership, IP, product rights, BOM, CAD, source files, know-how, and future commercialization rights related to Elbot
Total$4,000,000

Elbot is a joint product direction combining DeltaX’s robotics platform and Elbot’s product/application development. The proposed $300,000 allocation is intended to consolidate ownership and future commercialization rights. Elbot is not included in the first-phase production ramp-up to 100 units/month. The Phase 1 production focus remains Delta X Smart.

12-month spending plan

All supplier names and quotations below are preliminary. Formal supplier quotations will be collected during the first 1–2 months after investment. Until then, the quotation status should be considered “quotation pending.”

Amounts below are in USD thousands.

MonthProduction CAPEXWorking Capital & InventoryR&DSales & MarketingCE & ComplianceElbot AcquisitionMonthly Total
M112012040202550375
M2180120502525100500
M3180100603035100505
M41608060353550420
M5130607040300330
M6120507045250310
M7120507050100300
M812040706050295
M910030706050265
M109030706500255
M117020706000220
M121100506050225
Total1,5007007505502003004,000

Supplier / vendor shortlist and quotation status

CategoryPotential Suppliers / VendorsEstimated BudgetTimingQuote Status
Facility expansion and warehouse setupLocal industrial facility landlords / contractors in Da Nang or nearby industrial zones$200,000M1–M4Quotation pending
Mechanical standard partsMISUMI Vietnam, Kỷ Nguyên Máy$150,000M1–M6Quotation pending
Aluminum profiles / frame partsMISUMI Vietnam, Gia Minh Phát SG, G9 Industrial$120,000M1–M6Quotation pending
Electrical and automation componentsHợp Long Tech, Bảo An Automation$200,000M1–M8Quotation pending
Electronics / modules / connectorsThegioiic, Hshop, Nshop, Điện Tử Tương Lai$150,000M1–M8Quotation pending
PCB / electronics manufacturingThiên Lam PCB, PCB GraphTech, PCBWay as international backup$100,000M2–M8Quotation pending
Assembly stations and production toolsLocal tool/workbench suppliers, MISUMI, Kỷ Nguyên Máy$250,000M2–M8Quotation pending
QA/QC and measurement equipmentLocal industrial equipment suppliers / international suppliers where needed$250,000M2–M9Quotation pending
Robot testing and burn-in systemsInternal design + local fabrication + electrical suppliers$250,000M3–M10Internal design / quotation pending
ERP/MRP and traceabilityInternal system development + external software support if required$100,000M2–M12In development / quotation pending
CE consultant / certification bodyTÜV, SGS, Intertek, Bureau Veritas, or qualified regional testing partners$200,000M1–M6Quotation pending
Elbot IP/product acquisitionExisting Elbot partner/company$300,000M1–M4Subject to legal/IP due diligence

---

35. Production scale-up – which machines exactly? Supplier name, model, price, lead time, quote?

The Phase 1 production scale-up plan focuses on Delta X Smart. DeltaX does not plan to build a heavy manufacturing factory immediately. The main bottlenecks today are component purchasing capital, assembly labor, facility/warehouse space, and CE/compliance.

Current state:

ItemCurrent Status
Current normal production capacityApproximately 8 Delta X Smart units/month
Current maximum pressure capacityApproximately 15 units/month
Current assembly timeApproximately 5 working days per robot for 1 assembly employee
Current facility650 m²
Current monthly rentApproximately VND 60 million/month
Target facilityAt least 2,000 m²
Expected target rentApproximately VND 100–120 million/month
Supplier lead timeApproximately 3–4 weeks

The production scale-up budget is planned as follows:

CategoryEstimated BudgetPurposeSupplier / Status
Facility expansion and warehouse setup$200,000Expand from 650 m² to at least 2,000 m², build storage, assembly, testing, packing, and finished goods areasLocal facility / contractor, quotation pending
Assembly stations and line setup$250,000Dedicated stations for mechanical assembly, wiring, calibration, testing, packagingLocal suppliers / MISUMI / Kỷ Nguyên Máy, quotation pending
Tools, jigs, fixtures, torque tools, ESD tools$150,000Improve repeatability, reduce assembly errors, support faster training of workersMISUMI / Kỷ Nguyên Máy / local suppliers, quotation pending
QA/QC and inspection equipment$250,000Incoming inspection, in-process QC, final QC, dimensional checks, electrical checksLocal and international suppliers, quotation pending
Robot testing and burn-in systems$250,000Motion testing, repeatability testing, endurance testing, IO testing, safety checksInternal design + local fabrication, quotation pending
Light prototyping and production support equipment$150,0003D printers, light CNC/prototyping tools, fixture production, quick engineering changesSupplier to be selected, quotation pending
Warehouse, packaging, and material handling$100,000Racks, bins, barcode labels, packaging tools, material flow managementLocal suppliers, quotation pending
ERP/MRP and traceability system$100,000BOM control, inventory tracking, production planning, serial-number traceabilityInternal system + external support if required
Setup, training, installation, and contingency$50,000Installation, training, equipment setup, unexpected setup costsQuotation pending
Total$1,500,000

The goal is to move from small-batch founder-led production to a standardized assembly and testing system capable of supporting 100 Delta X Smart units/month readiness.

The company will prioritize:

  1. Stable component inventory.
  2. Standardized workstations.
  3. Assembly specialization.
  4. QA/QC checkpoints.
  5. Burn-in and repeatability testing.
  6. Serial-number traceability.
  7. CE-ready production documentation.

---

36. Engineering & R&D – how much for hiring? Equipment? What are the expected deliverables?

The Engineering & R&D budget is focused on making Delta X Smart more reliable, easier to manufacture, easier to support, and ready for international deployment.

The proposed R&D budget is $750,000.

R&D ItemEstimated BudgetPurpose
Engineering hiring$350,000Firmware, embedded systems, software, Vision AI, mechanical/manufacturing engineering
Delta X Smart standardization$100,000Standard configuration, design freeze, manufacturability improvement
Firmware and controller reliability$80,000IO, motor control, diagnostics, safety logic, firmware update process
Vision AI and calibration workflow$80,000Easier camera setup, calibration, model deployment, conveyor/vision workflow
Testing and reliability program$70,000Internal endurance testing, field issue reproduction, design validation
Engineering documentation and CE technical file support$50,000BOM, CAD, assembly instructions, service manuals, risk assessment support
R&D equipment and prototypes$20,000Engineering prototypes, sensors, cameras, development equipment
Total$750,000

Proposed R&D hiring plan

RoleHeadcountPurpose
Firmware / Embedded Engineer2Controller, IO, safety logic, firmware reliability, update process
Software / Vision AI Engineer2–3Vision AI, calibration tools, web control interface, diagnostics
Mechanical / Manufacturing Engineer2Design for manufacturability, fixtures, reliability, assembly process
QA/Reliability Engineer1–2Testing procedures, burn-in, defect tracking, design validation
Technical Documentation / Support Engineer1Manuals, service documents, technical files, customer support materials

Expected deliverables within 12 months

  1. Standardized Delta X Smart production configuration.
  2. Improved firmware and controller reliability.
  3. Better diagnostic tools for support and troubleshooting.
  4. Improved Vision AI and calibration workflow.
  5. More complete BOM, assembly instructions, service manuals, and test procedures.
  6. CE-ready technical documentation support.
  7. Reduced founder dependency through documentation and engineering ownership.
  8. Better manufacturability and more consistent product quality.

The purpose of the R&D budget is not only to create new features, but to industrialize Delta X Smart into a repeatable, supportable, and certifiable product.

---

37. Sales & Marketing – does this include a European sales manager? Trade shows? Distribution?

Yes. The Sales & Marketing budget includes international sales development, with a focus on Europe after CE readiness.

The proposed Sales & Marketing budget is $550,000.

ItemEstimated BudgetPurpose
International / Europe Sales Manager$110,000Manage leads, distributors, system integrators, quotations, and pipeline
Distributor and system integrator development$90,000Partner onboarding, training, documentation, technical support
Demo units and application kits$120,000Delta X Smart demo robots, Vision AI demo packages, application demos
Trade shows and customer visits$100,000Selected automation/robotics events and direct customer meetings
Marketing content and localization$60,000Datasheets, videos, manuals, case studies, website, localized materials
CRM and sales operations$40,000Pipeline tracking, lead management, customer status, sales reporting
Paid lead generation and digital marketing$30,000Targeted campaigns for qualified industrial leads
Total$550,000

The go-to-market strategy is to focus on standard Delta X Smart packages first, instead of too many custom projects. More complex applications will be handled through distributors and system integrator partners.

The expected commercial priorities are:

  1. Build a qualified European distributor/system integrator pipeline.
  2. Prepare CE-ready sales materials.
  3. Create standardized demo applications.
  4. Document ROI and customer case studies.
  5. Improve lead tracking and pipeline reporting.
  6. Reduce dependency on founder-led sales.

---

38. CE certification & compliance – which certification body? Quote? Exact timeline?

DeltaX has not yet completed formal EMC testing. The company has internal assessments, manuals, and technical documentation, but they are not yet complete for official CE certification.

The first CE target product will be Delta X Smart.

The target timeline is approximately 6 months, assuming no major redesign is required.

PeriodMilestone
Month 1Select CE consultant/testing partner and confirm applicable directives and standards
Month 1–2Complete risk assessment, manuals, wiring documentation, and technical file structure
Month 2–3Internal pre-compliance review and design corrections
Month 3–4Prepare sample units for EMC/electrical safety testing
Month 4–5Official lab testing or pre-lab testing
Month 5–6Fix non-conformities, finalize documentation, and prepare Declaration of Conformity path

The proposed CE/compliance budget is:

ItemEstimated Budget
CE consultant / compliance advisor$30,000
EMC and electrical safety testing$80,000
Product modifications after testing$30,000
Technical file, risk assessment, manuals, labels$30,000
Internal pre-compliance tools and documentation support$30,000
Total$200,000

Potential certification/testing partners include TÜV, SGS, Intertek, Bureau Veritas, or qualified regional testing partners. The certification body has not been selected yet, and formal quotations are pending.

DeltaX understands that CE certification may require design corrections, documentation improvements, EMC testing, electrical safety review, risk assessment, labeling, and manual updates. The company will prioritize CE readiness for Delta X Smart before scaling sales aggressively in Europe.

---

39. What happens if $4M is not enough? Is there a buffer? What is Plan B?

The $4M plan is designed around a focused product strategy: Delta X Smart in Phase 1. This reduces execution risk and avoids spreading capital across too many product lines.

If the $4M budget is not enough, DeltaX will apply the following Plan B:

  1. Keep the production focus on Delta X Smart and delay other product lines.
  2. Delay Elbot industrialization if the Elbot acquisition or integration becomes more expensive than expected.
  3. Keep production build-to-order or semi-build-to-order instead of building large finished-goods inventory.
  4. Use customer upfront payments to reduce working capital pressure.
  5. Delay non-critical CAPEX and outsource machining/fabrication where more cost-effective.
  6. Prioritize CE, production stability, QA/QC, and working capital before aggressive marketing spending.
  7. Reduce trade show and distributor spending if production capacity is not ready.
  8. Release capital in tranches based on operational KPIs.
  9. Use customer pre-orders, distributor deposits, or short-term trade financing if demand exceeds working capital.

Priority order if budget must be reduced:

PriorityKeep / Cut Decision
Must keepWorking capital, critical components, CE, QA/QC, production line setup
Can delayTrade shows, non-critical marketing, non-critical equipment
Can outsourceSome machining, fabrication, fixture production
Can phase laterElbot industrialization, new product lines, heavy CAPEX
Can adjustHiring speed, distributor expansion, demo units

The main principle is controlled scale-up, not uncontrolled expansion.

---

40. Is $200K working capital sufficient? 100 robots × manufacturing cost – what is the real need?

No. DeltaX does not treat $200K as the full working capital requirement.

The updated plan allocates approximately $700,000 to Working Capital & Initial Component Inventory.

For investment planning, the estimated full manufacturing cost of Delta X Smart is approximately $3,200 per unit after accounting for higher-quality sourcing, formalized production, QA/QC, packaging, labor, warranty reserve, and production buffer.

At the target capacity of 100 units/month:

ItemEstimate
Full manufacturing cost per Delta X Smart~$3,200
Target production volume100 units/month
Monthly production cost requirement~$320,000/month
Recommended critical component coverageAround 2 months
Initial component inventory + buffer need~$700,000

The company’s customer payment terms help reduce this pressure. Most customers currently pay 100% upfront. In some cases, customers pay a 50–70% deposit before production. Therefore, DeltaX does not plan to build excessive finished-goods inventory.

The company will use build-to-order or semi-build-to-order production planning, supported by customer payments, supplier planning, and controlled inventory.

The $700,000 working capital allocation is intended to cover:

  1. Long-lead-time components.
  2. Initial inventory for production ramp-up.
  3. Spare parts and warranty stock.
  4. Logistics and import timing buffer.
  5. Short-term production cashflow.
  6. Supplier lead time of approximately 3–4 weeks.

This approach is more realistic than treating $200,000 as the full working capital requirement.

---

41. What are the milestones for each $1M invested? Can a Tranche mechanism be built based on KPIs?

Yes. DeltaX is open to a tranche-based funding mechanism based on realistic operational KPIs.

Proposed tranche structure:

TrancheAmountTarget TimingKey Milestones
Tranche 1$1,000,000Closing to Month 2Secure facility expansion plan, order long-lead components, start supplier quotations, begin CE consultant selection, begin Elbot legal/IP due diligence, hire key production/QA roles
Tranche 2$1,000,000Month 3–5Reach 20–30 units/month capacity, complete first production stations, implement basic QA/QC checkpoints, complete CE documentation gap review, complete Elbot acquisition if due diligence is satisfactory
Tranche 3$1,000,000Month 6–9Reach 50–70 units/month capacity, stabilize inventory planning, begin CE testing/pre-testing, build distributor/demo pipeline, implement traceability workflow
Tranche 4$1,000,000Month 10–12Reach 80–100 units/month production readiness, complete major CE milestones, implement ERP/MRP workflow, demonstrate stable production and reporting process

Target KPIs:

KPICurrent / Target
Current normal capacity8 units/month
Current maximum pressure capacity15 units/month
6-month target30–40 units/month
9-month target50–70 units/month
12-month target80–100 units/month readiness
CE targetDelta X Smart CE path within approximately 6 months
Customer payment modelMostly 100% upfront, otherwise 50–70% deposit
Supplier lead timeApproximately 3–4 weeks
Working capital allocation~$700,000
Facility targetAt least 2,000 m²
ElbotOwnership/IP/product rights consolidation, subject to due diligence

This tranche structure protects the investor while ensuring DeltaX receives capital when it is ready to deploy it effectively.